





Japan’s Solar Expertise. Built for the Philippine Sun.
Proven Japanese technology, engineered for tropical climates and typhoon resilience. From zero-CAPEX business solar to utility-scale projects — we deliver clean, affordable, and reliable energy solutions for the Philippines.
Key Differentiators
Final inspection and testing in Japan before deployment.
Systems built to withstand 2400–5400 Pa wind and snow load.
PPA model for instant savings.
How We Work
From discovery to long-term asset care — a transparent, outcome-driven process.
Consultation
Share 3–6 months of electricity bills and site information for initial assessment.

Feasibility Study
Technical load analysis, savings projection, and ROI modeling tailored to your site.

Agreement Signing
Choose between zero-CAPEX PPA or EPC delivery based on your financial strategy.

Installation
Engineering, procurement, and construction to commissioning (typically 3–5 months).

Monitoring & Maintenance
24/7 performance monitoring, preventive maintenance, and optimization.

Partner With Us
We collaborate with EPC Contractors, System Integrators, LGUs, Utilities, Corporate Enterprises, Investors, and Developers. Join us in our mission to power the nation with sustainable energy.
Become an EPC Partner